تخطَّ إلى المحتوى

Installing automatic glass doors and shutters في a new shop or unit

Plan the opening, the power and the approvals before the fit-out reaches the frontage.

باختصار

Install in the right order: confirm the frontage, agree the door type, bring power and a switch to the head of the opening, then fit the door and test the sensors. Most delays come from missing power or landlord approval rather than the door itself. Tell us early and we help prepare the drawings.

Before the fit-out reaches the front

Ask the fit-out contractor to leave a clear opening, a level floor and a power point near the head of the door. If a shutter is planned, headroom for the box and side space for guides must be reserved.

Changing these later costs time. A site visit during early fit-out avoids that.

Installation order

  1. Survey

    Frontage, floor, power.

  2. Approval

    Landlord or mall rules.

  3. التوريد

    Frame, glass, operator.

  4. Fit

    Track, frame, operator.

  5. Test

    Sensors, reverse, lock.

What to ready before we arrive

الميزةWhoالسبب
Clear openingFit-out contractorSo frames fit
Power pointElectricianOperator and sensors
Landlord permissionTenantAvoids stop work
Floor finishContractorLevel threshold

Services for new units

What changes the quote

  • Frontage widthيختلفWider needs larger gear.
  • Glass specificationيختلفThicker glass is heavier.
  • Power already on siteأقلSaves cabling.
  • Out-of-hours workأعلىPlanning needed.

Installation questions

How long does a shop door install take?
It depends on the size and the site. We give an estimate after the survey rather than before it, and we plan the work out of trading hours where we can.
Can you supply the frame?
We can supply a frame or fit the operator to an existing one after checking that it is straight and strong enough for the automatic door.
Who arranges the landlord permit?
You, as the tenant, usually apply. We provide drawings, equipment data and a method statement to support the application.
Do I need a shutter and a door?
Many shops use both: an automatic door during trading hours and a shutter for out-of-hours security. The choice depends on the frontage and the landlord.
Can I add a shutter later?
Yes, if there is headroom for the shutter box and side room for the guides. Check this at the survey so nothing blocks it later.

Fitting out a new unit?

Share the plan or photos.

أرسل صورة واحصل على عرض سعر مكتوب

صورة أو صورتان للباب أو البوابة تكفيان للبدء. نتصل بك ونحجز المعاينة المجانية للموقع.

هل تحتاج إلى إصلاح باب أو بوابة في عجمان? احجز معاينة مجانية للموقع